Sr. No. | Title | Description | Document |
---|---|---|---|
1 | SHAKTI Policy | - |
Download(43.23 KB)
|
2 | SOP for Proportionate Reduction | - |
Download(1.85 MB)
|
3 | CEA Norms, 2024 | - |
Download(2.59 MB)
|
4 | Standard Operating Procedure for proportionate reduction of linkage to the coal block allocatees on the basis of requirement of coal being met from allotted coal mines/blocks. | - |
Download(1.85 MB)
|
5 | Policy guidelines for grant of 'Bridge Linkage' to specified end-use plants of Central and State Public Sector Undertakings (Both in Power as well as Non-Power sector) which have been allotted coal mines/ blocks. | - |
Download(826.41 KB)
|